
This proposal covers the installation of approximately 750 square feet of Safe Paws 72 FLOW artificial turf at 8981 Cypress Avenue, Fontana, CA 92335. The approved turf area is a simple 15' × 50' rectangle located along the south/right side of the backyard.
The 15-foot project width matches the nominal width of a full artificial-turf roll, allowing the turf to run continuously for approximately 50 feet with an efficient layout and minimal material waste. Final field measurements and trimming will be performed before installation.
Kreative Gardens will prepare the approved 750-square-foot footprint using standard artificial-turf installation procedures. Work includes excavation as required, commercial-grade weed-barrier fabric, recycled Class II road base, grading, moisture conditioning as needed, mechanical compaction, final surface preparation, turf placement, perimeter fastening, infill, power brushing, and cleanup.
The existing concrete at the front of the 15' × 50' rectangle will serve as the finished turf boundary on that side. Along the left, right, and rear sides of the installation, Kreative Gardens will install approximately 115 linear feet of 2" × 4" ground-contact copper-treated lumber to form a firm straight perimeter edge.
The treated-wood boundary will be reinforced with 12-inch composite stakes placed as required for stability. The turf will be cut, fitted, and securely fastened to the completed perimeter system.
The selected turf is Safe Paws 72 FLOW, a pet-oriented landscape turf with a soft four-tone appearance, approximately 1-inch pile height, 47-ounce face weight, approximately 72-ounce total weight, and a permeable SUPER FLOW backing. The product's listed drainage rate is approximately 1.47 gal/ft²/min and it carries an applicable 16-year manufacturer warranty, subject to the manufacturer's written terms and exclusions.
Because portions of the surrounding yard are uneven and may direct runoff toward the new turf, this proposal includes a dedicated surface-drainage component along the right side of the installation. Kreative Gardens will install a 4-inch round plastic drainage grate rated at approximately 12 gallons per minute, connect it to a 4-inch drainage pipe, excavate the required trench, install the necessary fittings, backfill the trench, and route the line toward the front driveway for discharge.
The final drain location, pipe route, and elevations will be adjusted in the field to work with the existing terrain and available gravity fall. This drainage system is intended to improve management of ordinary surface runoff within the project area; it is not an engineered stormwater system or a guarantee against flooding during exceptional rainfall or runoff conditions.
Where practical, Kreative Gardens will perform minor contouring and blending of adjacent soil immediately around the new turf to reduce obvious high spots that could direct mud, loose dirt, or runoff onto the finished artificial grass. This work is intended as a practical transition treatment only and does not include complete backyard grading, precision leveling, engineered drainage design, or reshaping of the entire property.
This all-inclusive price covers everything required for a professional and lasting installation — from premium materials and delivery to expert labor, site preparation, and final cleanup. We handle the entire process so you don’t have to coordinate with multiple contractors or worry about hidden fees. What you see is what you pay.
Clients who choose to pay in full at the time of approval enjoy a reduced total. This offer reflects the savings we pass along by avoiding third-party financing and administrative fees — while still delivering the same high-quality results.
** This quote is valid for 15 days from the date issued. After this period, pricing and availability may be subject to change without notice.




Safe Paws 72 FLOW is specially engineered for pet-friendly installations, offering both comfort and cleanliness. Featuring a monofilament double S-shaped blade with a soft, natural feel, it’s built with 4-tone PE yarn for a realistic look and texture. With a shorter 1-inch pile height and a tuft bind of ≥35N, this turf resists heavy traffic and active paws while remaining low-maintenance. What truly sets it apart is the SUPER FLOW permeable backing, designed for superior drainage—up to 60L/m²/min—making it the ideal solution for dog runs and high-moisture areas. Backed by a 16-year warranty and requiring only basic upkeep, Safe Paws 72 FLOW delivers durability, comfort, and peace of mind for pet owners.


This proposal is limited to the approximately 750-square-foot, 15' × 50' artificial-turf installation and the specific drainage work described in the Quote Summary. Unless specifically added through a written change order, the following are not included:
Project Area and Layout
Installation Details
Drainage
Warranty
Please take a moment to review the details below. These notes cover important aspects of your project, such as warranties, material handling, and general terms. We believe in transparency and want you to feel confident every step of the way.
Mechanic's Lien Warning
Under California law, any contractor, subcontractor, laborer, supplier, or other person who helps improve your property but is not paid may record what is called a mechanic's lien on your property. A mechanic’s lien is a claim made against your property and may affect your ability to sell or refinance. This could happen even if you have paid your contractor in full.To protect yourself, you should request a Lien Release from all contractors and subcontractors after work is completed.
Change Orders
Any additions or modifications to the scope of work must be documented in a written change order, signed by both parties before additional work is performed. Change orders may result in additional charges and could impact the project timeline.
Right to Cancel
You may cancel this agreement within three (3) business days of signing without penalty, as required by California state law. After this period, cancellations may be subject to forfeiture of any paid deposit, restocking fees, and/or costs incurred by the contractor up to the date of cancellation.
Payments
A deposit is due upon approval of the quote. Balance is due upon project completion unless otherwise agreed in writing. Accepted payment methods include cash, check, Zelle, or debit/credit (fees may apply). Failure to remit final payment may result in collections or lien proceedings.
Project Delays or Access Restrictions
The client is responsible for ensuring access to the work area. Unforeseen delays due to weather, access, hidden utilities, or client-caused schedule changes may result in rescheduling and additional costs.
This quote is valid for 15 calendar days. After that, pricing may need to be adjusted to reflect current material or labor costs. We recommend confirming your project promptly to lock in this rate.
Governing Law
This agreement shall be governed by and interpreted in accordance with the laws of the State of California. Any disputes shall be resolved in San Bernardino County, California.